Go to GreenTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
LCA Organic vs Conventional Orange Crops

Resource Stock Operating or Capital Budget Analyzer Views

Progress Analysis

Introduction
This tool generates a variety of basic resource stock stock statistics for DevTreks capital budgets and operating budgets.

Calculation View Description
v210a

Version: 1.9.0

Feedback About carbon/budgetgroup/LCA Organic vs Conventional Orange Crops/2140761977/budgetsbprogress1

Step 1 of 3. Make Selections


Display Full View:

Stocks to Analyze

Choose up to 10:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Aggregate Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Make sure the data being analyzed corresponds to either operating budgets or capital budgets.
  • Step 1. Analysis Type: Choose the type of analysis to run. Ensure that it coincides with the name of the analyzer being used.
  • Step 1. Stocks to Analyze: Choose up to 10 resource stock properties to analyze.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.
  • Step 2. Math Properties: Choose optional algorithms and subalgorithms. Refer to the CTA tutorial for options.
  • Step 2. Media URL: Delimited string of Media URLs that explain the analysis.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
LCA Organic vs Conventional Orange Crops
Budget Group : LCA Organic vs Conventional Orange Crops ; 07/16/2014
Budget AllAlt. 0Alt. 1
Name Conventional Orange Budget, BrazilOrganic Orange Budget, Brazil
Date 09/30/201709/30/2017
Label A100CA100C
Indicators AllAlt. 0Alt. 1
Target benchmarkactual
Date 09/30/201709/30/2017
Score Observations 2.06.0
Score Plan Period 20,104.420613,462.9569
Score Unit meanmean
Score Plan Full 20,104.420620,104.4206
Score Plan Cumul 20,104.420620,104.4206
Score Actual Period 0.000013,462.9569
Score Actual Cumul 0.000013,462.9569
Score Actual Period Change 0.00000.0000
Score Actual Cumul Change 0.0000-6,641.4637
Score Plan P Percent 0.0000100.0000
Score Plan C Percent 0.000066.9652
Score Plan Full Percent 0.000066.9652
Score Low Plan Period 20,069.473113,443.3282
Score Low Unit lower 90% cilower 90% ci
Score Low Plan Full 20,069.473120,069.4731
Score Low Plan Cumul 20,069.473120,069.4731
Score Low Actual Period 0.000013,443.3282
Score Low Actual Cumul 0.000013,443.3282
Score Low Actual Period Change 0.00000.0000
Score Low Actual Cumul Change 0.0000-6,626.1449
Score Low Plan P Percent 0.0000100.0000
Score Low Plan C Percent 0.000066.9840
Score Low Plan Full Percent 0.000066.9840
Score High Plan Period 20,139.368113,482.5856
Score High Unit upper 90% ciupper 90% ci
Score High Plan Full 20,139.368120,139.3681
Score High Plan Cumul 20,139.368120,139.3681
Score High Actual Period 0.000013,482.5856
Score High Actual Cumul 0.000013,482.5856
Score High Actual Period Change 0.00000.0000
Score High Actual Cumul Change 0.0000-6,656.7825
Score High Plan P Percent 0.0000100.0000
Score High Plan C Percent 0.000066.9464
Score High Plan Full Percent 0.000066.9464
Observations 1.03.0
Name Nitrate LossNitrate Loss
Label NO3NO3
Plan Period 4,633.63783,746.8749
Unit kg N03-N / hakg N03-N / ha
Plan Full 4,633.63784,633.6378
Plan Cumul 4,633.63784,633.6378
Actual Period 0.00003,746.8749
Actual Cumul 0.00003,746.8749
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-886.7629
Plan P Percent 0.0000100.0000
Plan C Percent 0.000080.8625
Plan Full Percent 0.000080.8625
Observations 1.03.0
Name Ammonia LossAmmonia Loss
Label NH3NH3
Plan Period 2,021.8662830.6262
Unit kg N03-N / hakg NH3-N / ha
Plan Full 2,021.86622,021.8662
Plan Cumul 2,021.86622,021.8662
Actual Period 0.0000830.6262
Actual Cumul 0.0000830.6262
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-1,191.2400
Plan P Percent 0.0000100.0000
Plan C Percent 0.000041.0822
Plan Full Percent 0.000041.0822
Observations 1.03.0
Name Nitrous Oxide EmissionsNitrous Oxide Loss
Label N2ON2O
Plan Period 504.9087376.0000
Unit kg N2O-N / hakg N2O-N / ha
Plan Full 504.9087504.9087
Plan Cumul 504.9087504.9087
Actual Period 0.0000376.0000
Actual Cumul 0.0000376.0000
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-128.9087
Plan P Percent 0.0000100.0000
Plan C Percent 0.000074.4689
Plan Full Percent 0.000074.4689
Observations 1.03.0
Name Global WarmingGlobal Warming
Label CO2ACO2A
Plan Period 16,218.396218,200.5250
Unit kg CO2 equivsCO2 eqivs / ha
Plan Full 16,218.396216,218.3962
Plan Cumul 16,218.396216,218.3962
Actual Period 0.000018,200.5250
Actual Cumul 0.000018,200.5250
Actual Period Change 0.00000.0000
Actual Cumul Change 0.00001,982.1288
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000112.2215
Plan Full Percent 0.0000112.2215
Observations 1.03.0
Name AcidificationAcidification
Label SO2ASO2A
Plan Period 339.1558805.0262
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 339.1558339.1558
Plan Cumul 339.1558339.1558
Actual Period 0.0000805.0262
Actual Cumul 0.0000805.0262
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000465.8704
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000237.3618
Plan Full Percent 0.0000237.3618
Observations 1.03.0
Name EutrophicationEutrophication
Label NO3ANO3A
Plan Period 646.27731,530.8524
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 646.2773646.2773
Plan Cumul 646.2773646.2773
Actual Period 0.00001,530.8524
Actual Cumul 0.00001,530.8524
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000884.5751
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000236.8724
Plan Full Percent 0.0000236.8724
Observations 1.03.0
Name EutrophicationEutrophication
Label NO3BNO3B
Plan Period 143.6468424.0587
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 143.6468143.6468
Plan Cumul 143.6468143.6468
Actual Period 0.0000424.0587
Actual Cumul 0.0000424.0587
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000280.4119
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000295.2093
Plan Full Percent 0.0000295.2093
Observations 1.03.0
Name AcidificationAcidification
Label SO2BSO2B
Plan Period 141.3029288.7000
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 141.3029141.3029
Plan Cumul 141.3029141.3029
Actual Period 0.0000288.7000
Actual Cumul 0.0000288.7000
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000147.3971
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000204.3129
Plan Full Percent 0.0000204.3129
Observations 1.03.0
Name NitrogenNitrogen
Label NN
Plan Period 27,199.93208,939.7824
Unit kg N / tonkg N / ton
Plan Full 27,199.932027,199.9320
Plan Cumul 27,199.932027,199.9320
Actual Period 0.00008,939.7824
Actual Cumul 0.00008,939.7824
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-18,260.1496
Plan P Percent 0.0000100.0000
Plan C Percent 0.000032.8669
Plan Full Percent 0.000032.8669
Observations 1.03.0
Name PhosphorousPhosphorous
Label PP
Plan Period 3,120.2776627.6882
Unit kg P / tonkg P / ton
Plan Full 3,120.27763,120.2776
Plan Cumul 3,120.27763,120.2776
Actual Period 0.0000627.6882
Actual Cumul 0.0000627.6882
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-2,492.5894
Plan P Percent 0.0000100.0000
Plan C Percent 0.000020.1164
Plan Full Percent 0.000020.1164
Time Period AllAlt. 0Alt. 1
Name 2012 Conventional Orange Crop2012 Organic Orange Crop
Date 12/31/201212/31/2012 12:00:00 AM
Label A1001C2012A1001C2012
Indicators AllAlt. 0Alt. 1
Target benchmarkactual
Date 12/31/201212/31/2012
Score Observations 2.02.0
Score Plan Period 3,066.69734,888.8633
Score Unit meanmean
Score Plan Full 20,104.420620,104.4206
Score Plan Cumul 3,066.69733,066.6973
Score Actual Period 0.00004,888.8633
Score Actual Cumul 0.00004,888.8633
Score Actual Period Change 0.00000.0000
Score Actual Cumul Change 0.00001,822.1660
Score Plan P Percent 0.0000100.0000
Score Plan C Percent 0.0000159.4179
Score Plan Full Percent 0.000024.3174
Score Low Plan Period 3,061.58234,880.6880
Score Low Unit lower 90% cilower 90% ci
Score Low Plan Full 20,069.473120,069.4731
Score Low Plan Cumul 3,061.58233,061.5823
Score Low Actual Period 0.00004,880.6880
Score Low Actual Cumul 0.00004,880.6880
Score Low Actual Period Change 0.00000.0000
Score Low Actual Cumul Change 0.00001,819.1057
Score Low Plan P Percent 0.0000100.0000
Score Low Plan C Percent 0.0000159.4172
Score Low Plan Full Percent 0.000024.3190
Score High Plan Period 3,071.81234,897.0386
Score High Unit upper 90% ciupper 90% ci
Score High Plan Full 20,139.368120,139.3681
Score High Plan Cumul 3,071.81233,071.8123
Score High Actual Period 0.00004,897.0386
Score High Actual Cumul 0.00004,897.0386
Score High Actual Period Change 0.00000.0000
Score High Actual Cumul Change 0.00001,825.2263
Score High Plan P Percent 0.0000100.0000
Score High Plan C Percent 0.0000159.4185
Score High Plan Full Percent 0.000024.3158
Observations 1.01.0
Name Nitrate LossNitrate Loss
Label NO3NO3
Plan Period 1,501.14181,321.9650
Unit kg N03-N / hakg N03-N / ha
Plan Full 4,633.63784,633.6378
Plan Cumul 1,501.14181,501.1418
Actual Period 0.00001,321.9650
Actual Cumul 0.00001,321.9650
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-179.1768
Plan P Percent 0.0000100.0000
Plan C Percent 0.000088.0640
Plan Full Percent 0.000028.5297
Observations 1.01.0
Name Ammonia LossAmmonia Loss
Label NH3NH3
Plan Period 710.7774304.5087
Unit kg N03-N / hakg NH3-N / ha
Plan Full 2,021.86622,021.8662
Plan Cumul 710.7774710.7774
Actual Period 0.0000304.5087
Actual Cumul 0.0000304.5087
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-406.2687
Plan P Percent 0.0000100.0000
Plan C Percent 0.000042.8416
Plan Full Percent 0.000015.0608
Observations 1.01.0
Name Nitrous Oxide EmissionsNitrous Oxide Loss
Label N2ON2O
Plan Period 177.6999139.2000
Unit kg N2O-N / hakg N2O-N / ha
Plan Full 504.9087504.9087
Plan Cumul 177.6999177.6999
Actual Period 0.0000139.2000
Actual Cumul 0.0000139.2000
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-38.4999
Plan P Percent 0.0000100.0000
Plan C Percent 0.000078.3343
Plan Full Percent 0.000027.5693
Observations 1.01.0
Name Global WarmingGlobal Warming
Label CO2CO2A
Plan Period 82.56186,699.1914
Unit kg CO2 equivsCO2 eqivs / ha
Plan Full 16,218.396216,218.3962
Plan Cumul 82.561882.5618
Actual Period 0.00006,699.1914
Actual Cumul 0.00006,699.1914
Actual Period Change 0.00000.0000
Actual Cumul Change 0.00006,616.6296
Plan P Percent 0.0000100.0000
Plan C Percent 0.00008,114.1538
Plan Full Percent 0.000041.3061
Observations 1.01.0
Name AcidificationAcidification
Label SO2ASO2A
Plan Period 122.1666287.1087
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 339.1558339.1558
Plan Cumul 122.1666122.1666
Actual Period 0.0000287.1087
Actual Cumul 0.0000287.1087
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000164.9421
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000235.0141
Plan Full Percent 0.000084.6539
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3ANO3A
Plan Period 233.2221556.8174
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 646.2773646.2773
Plan Cumul 233.2221233.2221
Actual Period 0.0000556.8174
Actual Cumul 0.0000556.8174
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000323.5953
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000238.7498
Plan Full Percent 0.000086.1577
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3ENO3B
Plan Period 1.2876152.2587
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 143.6468143.6468
Plan Cumul 1.28761.2876
Actual Period 0.0000152.2587
Actual Cumul 0.0000152.2587
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000150.9711
Plan P Percent 0.0000100.0000
Plan C Percent 0.000011,825.0000
Plan Full Percent 0.0000105.9952
Observations 1.01.0
Name AcidificationAcidification
Label SO2BSO2B
Plan Period 66.6333104.4000
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 141.3029141.3029
Plan Cumul 66.633366.6333
Actual Period 0.0000104.4000
Actual Cumul 0.0000104.4000
Actual Period Change 0.00000.0000
Actual Cumul Change 0.000037.7667
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000156.6784
Plan Full Percent 0.000073.8838
Observations 1.01.0
Name NitrogenNitrogen
Label NN
Plan Period 2,401.51003,233.0088
Unit kg N / tonkg N / ton
Plan Full 27,199.932027,199.9320
Plan Cumul 2,401.51002,401.5100
Actual Period 0.00003,233.0088
Actual Cumul 0.00003,233.0088
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000831.4988
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000134.6240
Plan Full Percent 0.000011.8861
Observations 1.01.0
Name PhosphorousPhosphorous
Label PP
Plan Period 235.8360223.9794
Unit kg P / tonkg P / ton
Plan Full 3,120.27763,120.2776
Plan Cumul 235.8360235.8360
Actual Period 0.0000223.9794
Actual Cumul 0.0000223.9794
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-11.8566
Plan P Percent 0.0000100.0000
Plan C Percent 0.000094.9725
Plan Full Percent 0.00007.1782
Outcome AllAlt. 0Alt. 1
Name 2012 Conventional Orange Crop Outcome2012 Organic Orange Crop Outcome
Date 12/31/201212/31/2012 12:00:00 AM
Label A1001C2012A1001C2012
Indicators AllAlt. 0Alt. 1
Target benchmarkactual
Date 12/31/201212/31/2012
Score Observations 1.01.0
Score Plan Period 1,300.65403,322.8198
Score Unit meanmean
Score Plan Full 1,300.65401,300.6540
Score Plan Cumul 1,300.65401,300.6540
Score Actual Period 0.00003,322.8198
Score Actual Cumul 0.00003,322.8198
Score Actual Period Change 0.00000.0000
Score Actual Cumul Change 0.00002,022.1658
Score Plan P Percent 0.0000100.0000
Score Plan C Percent 0.0000255.4730
Score Plan Full Percent 0.0000255.4730
Score Low Plan Period 1,298.53603,317.2110
Score Low Unit lower 90% cilower 90% ci
Score Low Plan Full 1,298.53601,298.5360
Score Low Plan Cumul 1,298.53601,298.5360
Score Low Actual Period 0.00003,317.2110
Score Low Actual Cumul 0.00003,317.2110
Score Low Actual Period Change 0.00000.0000
Score Low Actual Cumul Change 0.00002,018.6750
Score Low Plan P Percent 0.0000100.0000
Score Low Plan C Percent 0.0000255.4578
Score Low Plan Full Percent 0.0000255.4578
Score High Plan Period 1,302.77203,328.4286
Score High Unit upper 90% ciupper 90% ci
Score High Plan Full 1,302.77201,302.7720
Score High Plan Cumul 1,302.77201,302.7720
Score High Actual Period 0.00003,328.4286
Score High Actual Cumul 0.00003,328.4286
Score High Actual Period Change 0.00000.0000
Score High Actual Cumul Change 0.00002,025.6566
Score High Plan P Percent 0.0000100.0000
Score High Plan C Percent 0.0000255.4882
Score High Plan Full Percent 0.0000255.4882
Observations 1.01.0
Name NitrogenNitrogen
Label NN
Plan Period 2,401.51003,233.0088
Unit kg N / tonkg N / ton
Plan Full 2,401.51002,401.5100
Plan Cumul 2,401.51002,401.5100
Actual Period 0.00003,233.0088
Actual Cumul 0.00003,233.0088
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000831.4988
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000134.6240
Plan Full Percent 0.0000134.6240
Observations 1.01.0
Name PhosphorousPhosphorous
Label PP
Plan Period 235.8360223.9794
Unit kg P / tonkg P / ton
Plan Full 235.8360235.8360
Plan Cumul 235.8360235.8360
Actual Period 0.0000223.9794
Actual Cumul 0.0000223.9794
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-11.8566
Plan P Percent 0.0000100.0000
Plan C Percent 0.000094.9725
Plan Full Percent 0.000094.9725
Operation AllAlt. 0Alt. 1
Name 2012 Conventional Orange Crop Operation2012 Organic Orange Crop Operation
Date 12/31/201212/31/2012 12:00:00 AM
Label A1001C2012A1001C2012
Indicators AllAlt. 0Alt. 1
Target benchmarkactual
Date 12/31/201212/31/2012
Score Observations 1.01.0
Score Plan Period 1,766.04331,566.0435
Score Unit meanmean
Score Plan Full 1,766.04331,766.0433
Score Plan Cumul 1,766.04331,766.0433
Score Actual Period 0.00001,566.0435
Score Actual Cumul 0.00001,566.0435
Score Actual Period Change 0.00000.0000
Score Actual Cumul Change 0.0000-199.9998
Score Plan P Percent 0.0000100.0000
Score Plan C Percent 0.000088.6753
Score Plan Full Percent 0.000088.6753
Score Low Plan Period 1,763.04631,563.4770
Score Low Unit lower 90 % cilower 90% ci
Score Low Plan Full 1,763.04631,763.0463
Score Low Plan Cumul 1,763.04631,763.0463
Score Low Actual Period 0.00001,563.4770
Score Low Actual Cumul 0.00001,563.4770
Score Low Actual Period Change 0.00000.0000
Score Low Actual Cumul Change 0.0000-199.5693
Score Low Plan P Percent 0.0000100.0000
Score Low Plan C Percent 0.000088.6804
Score Low Plan Full Percent 0.000088.6804
Score High Plan Period 1,769.04031,568.6100
Score High Unit upper 90 % ciupper 90% ci
Score High Plan Full 1,769.04031,769.0403
Score High Plan Cumul 1,769.04031,769.0403
Score High Actual Period 0.00001,568.6100
Score High Actual Cumul 0.00001,568.6100
Score High Actual Period Change 0.00000.0000
Score High Actual Cumul Change 0.0000-200.4303
Score High Plan P Percent 0.0000100.0000
Score High Plan C Percent 0.000088.6701
Score High Plan Full Percent 0.000088.6701
Observations 1.01.0
Name Nitrate LossNitrate Loss
Label NO3NO3
Plan Period 1,501.14181,321.9650
Unit kg N03-N / hakg N03-N / ha
Plan Full 1,501.14181,501.1418
Plan Cumul 1,501.14181,501.1418
Actual Period 0.00001,321.9650
Actual Cumul 0.00001,321.9650
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-179.1768
Plan P Percent 0.0000100.0000
Plan C Percent 0.000088.0640
Plan Full Percent 0.000088.0640
Observations 1.01.0
Name Ammonia LossAmmonia Loss
Label NH3NH3
Plan Period 710.7774304.5087
Unit kg N03-N / hakg NH3-N / ha
Plan Full 710.7774710.7774
Plan Cumul 710.7774710.7774
Actual Period 0.0000304.5087
Actual Cumul 0.0000304.5087
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-406.2687
Plan P Percent 0.0000100.0000
Plan C Percent 0.000042.8416
Plan Full Percent 0.000042.8416
Observations 1.01.0
Name Nitrous Oxide EmissionsNitrous Oxide Loss
Label N2ON2O
Plan Period 177.6999139.2000
Unit kg N2O-N / hakg N2O-N / ha
Plan Full 177.6999177.6999
Plan Cumul 177.6999177.6999
Actual Period 0.0000139.2000
Actual Cumul 0.0000139.2000
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-38.4999
Plan P Percent 0.0000100.0000
Plan C Percent 0.000078.3343
Plan Full Percent 0.000078.3343
Observations 1.01.0
Name Global WarmingGlobal Warming
Label CO2CO2A
Plan Period 82.56186,699.1914
Unit kg CO2 equivsCO2 eqivs / ha
Plan Full 82.561882.5618
Plan Cumul 82.561882.5618
Actual Period 0.00006,699.1914
Actual Cumul 0.00006,699.1914
Actual Period Change 0.00000.0000
Actual Cumul Change 0.00006,616.6296
Plan P Percent 0.0000100.0000
Plan C Percent 0.00008,114.1538
Plan Full Percent 0.00008,114.1538
Observations 1.01.0
Name AcidificationAcidification
Label SO2ASO2A
Plan Period 122.1666287.1087
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 122.1666122.1666
Plan Cumul 122.1666122.1666
Actual Period 0.0000287.1087
Actual Cumul 0.0000287.1087
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000164.9421
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000235.0141
Plan Full Percent 0.0000235.0141
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3ANO3A
Plan Period 233.2221556.8174
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 233.2221233.2221
Plan Cumul 233.2221233.2221
Actual Period 0.0000556.8174
Actual Cumul 0.0000556.8174
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000323.5953
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000238.7498
Plan Full Percent 0.0000238.7498
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3ENO3B
Plan Period 1.2876152.2587
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 1.28761.2876
Plan Cumul 1.28761.2876
Actual Period 0.0000152.2587
Actual Cumul 0.0000152.2587
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000150.9711
Plan P Percent 0.0000100.0000
Plan C Percent 0.000011,825.0000
Plan Full Percent 0.000011,825.0000
Observations 1.01.0
Name AcidificationAcidification
Label SO2BSO2B
Plan Period 66.6333104.4000
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 66.633366.6333
Plan Cumul 66.633366.6333
Actual Period 0.0000104.4000
Actual Cumul 0.0000104.4000
Actual Period Change 0.00000.0000
Actual Cumul Change 0.000037.7667
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000156.6784
Plan Full Percent 0.0000156.6784
Time Period AllAlt. 0Alt. 1
Name 2013 Conventional Orange Crop2013 Organic Orange Crop
Date 12/31/201312/31/2013 12:00:00 AM
Label A1001C2013A1001C2013
Indicators AllAlt. 0Alt. 1
Target benchmarkactual
Date 12/31/201312/31/2013
Score Observations 2.02.0
Score Plan Period 2,923.24024,292.4416
Score Unit meanmean
Score Plan Full 20,104.420620,104.4206
Score Plan Cumul 5,989.93755,989.9375
Score Actual Period 0.00004,292.4416
Score Actual Cumul 0.00009,181.3049
Score Actual Period Change 0.00000.0000
Score Actual Cumul Change 0.00003,191.3674
Score Plan P Percent 0.0000100.0000
Score Plan C Percent 0.0000153.2788
Score Plan Full Percent 0.000045.6681
Score Low Plan Period 2,918.25674,286.9332
Score Low Unit lower 90% cilower 90% ci
Score Low Plan Full 20,069.473120,069.4731
Score Low Plan Cumul 5,979.83905,979.8390
Score Low Actual Period 0.00004,286.9332
Score Low Actual Cumul 0.00009,167.6212
Score Low Actual Period Change 0.00000.0000
Score Low Actual Cumul Change 0.00003,187.7822
Score Low Plan P Percent 0.0000100.0000
Score Low Plan C Percent 0.0000153.3088
Score Low Plan Full Percent 0.000045.6794
Score High Plan Period 2,928.22374,297.9500
Score High Unit upper 90% ciupper 90% ci
Score High Plan Full 20,139.368120,139.3681
Score High Plan Cumul 6,000.03606,000.0360
Score High Actual Period 0.00004,297.9500
Score High Actual Cumul 0.00009,194.9886
Score High Actual Period Change 0.00000.0000
Score High Actual Cumul Change 0.00003,194.9526
Score High Plan P Percent 0.0000100.0000
Score High Plan C Percent 0.0000153.2489
Score High Plan Full Percent 0.000045.6568
Observations 1.01.0
Name Nitrate LossNitrate Loss
Label NO3NO3
Plan Period 1,553.58101,318.3773
Unit kg N03-N / hakg N03-N / ha
Plan Full 4,633.63784,633.6378
Plan Cumul 3,054.72283,054.7228
Actual Period 0.00001,318.3773
Actual Cumul 0.00002,640.3423
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-414.3805
Plan P Percent 0.0000100.0000
Plan C Percent 0.000086.4348
Plan Full Percent 0.000056.9821
Observations 1.01.0
Name Ammonia LossAmmonia Loss
Label NH3NH3
Plan Period 678.8910288.3093
Unit kg N03-N / hakg NH3-N / ha
Plan Full 2,021.86622,021.8662
Plan Cumul 1,389.66841,389.6684
Actual Period 0.0000288.3093
Actual Cumul 0.0000592.8180
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-796.8504
Plan P Percent 0.0000100.0000
Plan C Percent 0.000042.6590
Plan Full Percent 0.000029.3203
Observations 1.01.0
Name Nitrous Oxide EmissionsNitrous Oxide Loss
Label N2ON2O
Plan Period 169.1535130.2000
Unit kg N2O-N / hakg N2O-N / ha
Plan Full 504.9087504.9087
Plan Cumul 346.8534346.8534
Actual Period 0.0000130.2000
Actual Cumul 0.0000269.4000
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-77.4534
Plan P Percent 0.0000100.0000
Plan C Percent 0.000077.6697
Plan Full Percent 0.000053.3562
Observations 1.01.0
Name Global WarmingGlobal Warming
Label CO2ACO2A
Plan Period 7,940.37056,417.1860
Unit kg CO2 equivsCO2 eqivs / ha
Plan Full 16,218.396216,218.3962
Plan Cumul 8,022.93238,022.9323
Actual Period 0.00006,417.1860
Actual Cumul 0.000013,116.3774
Actual Period Change 0.00000.0000
Actual Cumul Change 0.00005,093.4451
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000163.4861
Plan Full Percent 0.000080.8735
Observations 1.01.0
Name AcidificationAcidification
Label SO2ASO2A
Plan Period 111.6190288.3093
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 339.1558339.1558
Plan Cumul 233.7856233.7856
Actual Period 0.0000288.3093
Actual Cumul 0.0000575.4180
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000341.6324
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000246.1306
Plan Full Percent 0.0000169.6618
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3ANO3A
Plan Period 214.0265539.4186
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 646.2773646.2773
Plan Cumul 447.2486447.2486
Actual Period 0.0000539.4186
Actual Cumul 0.00001,096.2360
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000648.9874
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000245.1066
Plan Full Percent 0.0000169.6232
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3BNO3B
Plan Period 29.9690148.8000
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 143.6468143.6468
Plan Cumul 31.256631.2566
Actual Period 0.0000148.8000
Actual Cumul 0.0000301.0587
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000269.8021
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000963.1844
Plan Full Percent 0.0000209.5826
Observations 1.01.0
Name AcidificationAcidification
Label SO2BSO2B
Plan Period 16.1345102.3000
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 141.3029141.3029
Plan Cumul 82.767882.7678
Actual Period 0.0000102.3000
Actual Cumul 0.0000206.7000
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000123.9322
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000249.7348
Plan Full Percent 0.0000146.2815
Observations 1.01.0
Name NitrogenNitrogen
Label NN
Plan Period 2,281.43452,714.1216
Unit kg N / tonkg N / ton
Plan Full 27,199.932027,199.9320
Plan Cumul 4,682.94454,682.9445
Actual Period 0.00002,714.1216
Actual Cumul 0.00005,947.1304
Actual Period Change 0.00000.0000
Actual Cumul Change 0.00001,264.1859
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000126.9955
Plan Full Percent 0.000021.8645
Observations 1.01.0
Name PhosphorousPhosphorous
Label PP
Plan Period 236.5291188.4048
Unit kg P / tonkg P / ton
Plan Full 3,120.27763,120.2776
Plan Cumul 472.3651472.3651
Actual Period 0.0000188.4048
Actual Cumul 0.0000412.3842
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-59.9809
Plan P Percent 0.0000100.0000
Plan C Percent 0.000087.3020
Plan Full Percent 0.000013.2163
Outcome AllAlt. 0Alt. 1
Name 2013 Conventional Orange Crop Outcome2013 Organic Orange Crop Outcome
Date 12/31/201312/31/2013 12:00:00 AM
Label A1001C2013A1001C2013
Indicators AllAlt. 0Alt. 1
Target actualactual
Date 12/31/201312/31/2013
Score Observations 1.01.0
Score Plan Period 1,254.67072,793.2816
Score Unit meanmean
Score Plan Full 0.00000.0000
Score Plan Cumul 0.00000.0000
Score Actual Period 1,254.67072,793.2816
Score Actual Cumul 1,254.67076,116.1014
Score Actual Period Change 0.00000.0000
Score Actual Cumul Change 1,254.67076,116.1014
Score Plan P Percent 100.0000100.0000
Score Plan C Percent 0.00000.0000
Score Plan Full Percent 0.00000.0000
Score Low Plan Period 1,252.50472,788.0336
Score Low Unit lower 90% cilower 90% ci
Score Low Plan Full 0.00000.0000
Score Low Plan Cumul 0.00000.0000
Score Low Actual Period 1,252.50472,788.0336
Score Low Actual Cumul 1,252.50476,105.2446
Score Low Actual Period Change 0.00000.0000
Score Low Actual Cumul Change 1,252.50476,105.2446
Score Low Plan P Percent 100.0000100.0000
Score Low Plan C Percent 0.00000.0000
Score Low Plan Full Percent 0.00000.0000
Score High Plan Period 1,256.83672,798.5296
Score High Unit upper 90% ciupper 90% ci
Score High Plan Full 0.00000.0000
Score High Plan Cumul 0.00000.0000
Score High Actual Period 1,256.83672,798.5296
Score High Actual Cumul 1,256.83676,126.9582
Score High Actual Period Change 0.00000.0000
Score High Actual Cumul Change 1,256.83676,126.9582
Score High Plan P Percent 100.0000100.0000
Score High Plan C Percent 0.00000.0000
Score High Plan Full Percent 0.00000.0000
Observations 1.01.0
Name NitrogenNitrogen
Label NN
Plan Period 2,281.43452,714.1216
Unit kg N / tonkg N / ton
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 2,281.43452,714.1216
Actual Cumul 2,281.43455,947.1304
Actual Period Change 0.00000.0000
Actual Cumul Change 2,281.43455,947.1304
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name PhosphorousPhosphorous
Label PP
Plan Period 236.5291188.4048
Unit kg P / tonkg P / ton
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 236.5291188.4048
Actual Cumul 236.5291412.3842
Actual Period Change 0.00000.0000
Actual Cumul Change 236.5291412.3842
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Operation AllAlt. 0Alt. 1
Name 2013 Conventional Orange Crop Operation2013 Organic Orange Crop Operation
Date 12/31/201312/31/2013 12:00:00 AM
Label A1001C2013A1001C2013
Indicators AllAlt. 0Alt. 1
Target actualactual
Date 12/31/201312/31/2013
Score Observations 1.01.0
Score Plan Period 1,668.56951,499.1600
Score Unit meanmean
Score Plan Full 0.00000.0000
Score Plan Cumul 0.00000.0000
Score Actual Period 1,668.56951,499.1600
Score Actual Cumul 1,668.56953,065.2035
Score Actual Period Change 0.00000.0000
Score Actual Cumul Change 1,668.56953,065.2035
Score Plan P Percent 100.0000100.0000
Score Plan C Percent 0.00000.0000
Score Plan Full Percent 0.00000.0000
Score Low Plan Period 1,665.75201,498.8996
Score Low Unit lower 90% cilower 90% ci
Score Low Plan Full 0.00000.0000
Score Low Plan Cumul 0.00000.0000
Score Low Actual Period 1,665.75201,498.8996
Score Low Actual Cumul 1,665.75203,062.3766
Score Low Actual Period Change 0.00000.0000
Score Low Actual Cumul Change 1,665.75203,062.3766
Score Low Plan P Percent 100.0000100.0000
Score Low Plan C Percent 0.00000.0000
Score Low Plan Full Percent 0.00000.0000
Score High Plan Period 1,671.38701,499.4204
Score High Unit upper 90% ciupper 90% ci
Score High Plan Full 0.00000.0000
Score High Plan Cumul 0.00000.0000
Score High Actual Period 1,671.38701,499.4204
Score High Actual Cumul 1,671.38703,068.0304
Score High Actual Period Change 0.00000.0000
Score High Actual Cumul Change 1,671.38703,068.0304
Score High Plan P Percent 100.0000100.0000
Score High Plan C Percent 0.00000.0000
Score High Plan Full Percent 0.00000.0000
Observations 1.01.0
Name Nitrate LossNitrate Loss
Label NO3NO3
Plan Period 1,553.58101,318.3773
Unit kg N03-N / hakg N03-N / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 1,553.58101,318.3773
Actual Cumul 1,553.58102,640.3423
Actual Period Change 0.00000.0000
Actual Cumul Change 1,553.58102,640.3423
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name Ammonia LossAmmonia Loss
Label NH3NH3
Plan Period 678.8910288.3093
Unit kg N03-N / hakg NH3-N / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 678.8910288.3093
Actual Cumul 678.8910592.8180
Actual Period Change 0.00000.0000
Actual Cumul Change 678.8910592.8180
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name Nitrous Oxide EmissionsNitrous Oxide Loss
Label N2ON2O
Plan Period 169.1535130.2000
Unit kg N2O-N / hakg N2O-N / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 169.1535130.2000
Actual Cumul 169.1535269.4000
Actual Period Change 0.00000.0000
Actual Cumul Change 169.1535269.4000
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name Global WarmingGlobal Warming
Label CO2ACO2A
Plan Period 7,940.37056,417.1860
Unit kg CO2 equivsCO2 eqivs / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 7,940.37056,417.1860
Actual Cumul 7,940.370513,116.3774
Actual Period Change 0.00000.0000
Actual Cumul Change 7,940.370513,116.3774
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name AcidificationAcidification
Label SO2ASO2A
Plan Period 111.6190288.3093
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 111.6190288.3093
Actual Cumul 111.6190575.4180
Actual Period Change 0.00000.0000
Actual Cumul Change 111.6190575.4180
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3ANO3A
Plan Period 214.0265539.4186
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 214.0265539.4186
Actual Cumul 214.02651,096.2360
Actual Period Change 0.00000.0000
Actual Cumul Change 214.02651,096.2360
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3BNO3B
Plan Period 29.9690148.8000
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 29.9690148.8000
Actual Cumul 29.9690301.0587
Actual Period Change 0.00000.0000
Actual Cumul Change 29.9690301.0587
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name AcidificationAcidification
Label SO2BSO2B
Plan Period 16.1345102.3000
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 16.1345102.3000
Actual Cumul 16.1345206.7000
Actual Period Change 0.00000.0000
Actual Cumul Change 16.1345206.7000
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Time Period AllAlt. 0Alt. 1
Name 2014 Conventional Orange Crop2014 Organic Orange Crop
Date 12/31/201412/31/2014 12:00:00 AM
Label A1001C2014A1001C2014
Indicators AllAlt. 0Alt. 1
Target benchmarkactual
Date 12/31/201412/31/2014
Score Observations 2.02.0
Score Plan Period 14,114.48314,281.6520
Score Unit meanmean
Score Plan Full 20,104.420620,104.4206
Score Plan Cumul 20,104.420620,104.4206
Score Actual Period 0.00004,281.6520
Score Actual Cumul 0.000013,462.9569
Score Actual Period Change 0.00000.0000
Score Actual Cumul Change 0.0000-6,641.4637
Score Plan P Percent 0.0000100.0000
Score Plan C Percent 0.000066.9652
Score Plan Full Percent 0.000066.9652
Score Low Plan Period 14,089.63414,275.7070
Score Low Unit lower 90% cilower 90% ci
Score Low Plan Full 20,069.473120,069.4731
Score Low Plan Cumul 20,069.473120,069.4731
Score Low Actual Period 0.00004,275.7070
Score Low Actual Cumul 0.000013,443.3282
Score Low Actual Period Change 0.00000.0000
Score Low Actual Cumul Change 0.0000-6,626.1449
Score Low Plan P Percent 0.0000100.0000
Score Low Plan C Percent 0.000066.9840
Score Low Plan Full Percent 0.000066.9840
Score High Plan Period 14,139.33214,287.5970
Score High Unit upper 90% ciupper 90% ci
Score High Plan Full 20,139.368120,139.3681
Score High Plan Cumul 20,139.368120,139.3681
Score High Actual Period 0.00004,287.5970
Score High Actual Cumul 0.000013,482.5856
Score High Actual Period Change 0.00000.0000
Score High Actual Cumul Change 0.0000-6,656.7825
Score High Plan P Percent 0.0000100.0000
Score High Plan C Percent 0.000066.9464
Score High Plan Full Percent 0.000066.9464
Observations 1.01.0
Name Nitrate LossNitrate Loss
Label NO3NO3
Plan Period 1,578.91501,106.5326
Unit kg N03-N / hakg N03-N / ha
Plan Full 4,633.63784,633.6378
Plan Cumul 4,633.63784,633.6378
Actual Period 0.00001,106.5326
Actual Cumul 0.00003,746.8749
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-886.7629
Plan P Percent 0.0000100.0000
Plan C Percent 0.000080.8625
Plan Full Percent 0.000080.8625
Observations 1.01.0
Name Ammonia LossAmmonia Loss
Label NH3NH3
Plan Period 632.1978237.8082
Unit kg N03-N / hakg NH3-N / ha
Plan Full 2,021.86622,021.8662
Plan Cumul 2,021.86622,021.8662
Actual Period 0.0000237.8082
Actual Cumul 0.0000830.6262
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-1,191.2400
Plan P Percent 0.0000100.0000
Plan C Percent 0.000041.0822
Plan Full Percent 0.000041.0822
Observations 1.01.0
Name Nitrous Oxide EmissionsNitrous Oxide Loss
Label N2ON2O
Plan Period 158.0553106.6000
Unit kg N2O-N / hakg N2O-N / ha
Plan Full 504.9087504.9087
Plan Cumul 504.9087504.9087
Actual Period 0.0000106.6000
Actual Cumul 0.0000376.0000
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-128.9087
Plan P Percent 0.0000100.0000
Plan C Percent 0.000074.4689
Plan Full Percent 0.000074.4689
Observations 1.01.0
Name Global WarmingGlobal Warming
Label CO2ACO2A
Plan Period 8,195.46395,084.1476
Unit kg CO2 equivsCO2 eqivs / ha
Plan Full 16,218.396216,218.3962
Plan Cumul 16,218.396216,218.3962
Actual Period 0.00005,084.1476
Actual Cumul 0.000018,200.5250
Actual Period Change 0.00000.0000
Actual Cumul Change 0.00001,982.1288
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000112.2215
Plan Full Percent 0.0000112.2215
Observations 1.01.0
Name AcidificationAcidification
Label SO2ASO2A
Plan Period 105.3702229.6082
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 339.1558339.1558
Plan Cumul 339.1558339.1558
Actual Period 0.0000229.6082
Actual Cumul 0.0000805.0262
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000465.8704
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000237.3618
Plan Full Percent 0.0000237.3618
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3ANO3A
Plan Period 199.0287434.6164
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 646.2773646.2773
Plan Cumul 646.2773646.2773
Actual Period 0.0000434.6164
Actual Cumul 0.00001,530.8524
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000884.5751
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000236.8724
Plan Full Percent 0.0000236.8724
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3BNO3B
Plan Period 112.3902123.0000
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 143.6468143.6468
Plan Cumul 143.6468143.6468
Actual Period 0.0000123.0000
Actual Cumul 0.0000424.0587
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000280.4119
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000295.2093
Plan Full Percent 0.0000295.2093
Observations 1.01.0
Name AcidificationAcidification
Label SO2BSO2B
Plan Period 58.535182.0000
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 141.3029141.3029
Plan Cumul 141.3029141.3029
Actual Period 0.000082.0000
Actual Cumul 0.0000288.7000
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000147.3971
Plan P Percent 0.0000100.0000
Plan C Percent 0.0000204.3129
Plan Full Percent 0.0000204.3129
Observations 1.01.0
Name NitrogenNitrogen
Label NN
Plan Period 22,516.98752,992.6520
Unit kg N / tonkg N / ton
Plan Full 27,199.932027,199.9320
Plan Cumul 27,199.932027,199.9320
Actual Period 0.00002,992.6520
Actual Cumul 0.00008,939.7824
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-18,260.1496
Plan P Percent 0.0000100.0000
Plan C Percent 0.000032.8669
Plan Full Percent 0.000032.8669
Observations 1.01.0
Name PhosphorousPhosphorous
Label PP
Plan Period 2,647.9125215.3040
Unit kg P / tonkg P / ton
Plan Full 3,120.27763,120.2776
Plan Cumul 3,120.27763,120.2776
Actual Period 0.0000215.3040
Actual Cumul 0.0000627.6882
Actual Period Change 0.00000.0000
Actual Cumul Change 0.0000-2,492.5894
Plan P Percent 0.0000100.0000
Plan C Percent 0.000020.1164
Plan Full Percent 0.000020.1164
Outcome AllAlt. 0Alt. 1
Name 2014 Conventional Orange Crop Outcome2014 Organic Orange Crop Outcome
Date 12/31/201412/31/2014 12:00:00 AM
Label A1001C2014A1001C2014
Indicators AllAlt. 0Alt. 1
Target actualactual
Date 12/31/201412/31/2014
Score Observations 1.01.0
Score Plan Period 12,381.79503,092.6520
Score Unit meanmean
Score Plan Full 0.00000.0000
Score Plan Cumul 0.00000.0000
Score Actual Period 12,381.79503,092.6520
Score Actual Cumul 13,636.465710,463.4241
Score Actual Period Change 0.00000.0000
Score Actual Cumul Change 13,636.465710,463.4241
Score Plan P Percent 100.0000100.0000
Score Plan C Percent 0.00000.0000
Score Plan Full Percent 0.00000.0000
Score Low Plan Period 12,359.81253,086.9120
Score Low Unit lower 90% cilower 90% ci
Score Low Plan Full 0.00000.0000
Score Low Plan Cumul 0.00000.0000
Score Low Actual Period 12,359.81253,086.9120
Score Low Actual Cumul 13,612.317210,444.6613
Score Low Actual Period Change 0.00000.0000
Score Low Actual Cumul Change 13,612.317210,444.6613
Score Low Plan P Percent 100.0000100.0000
Score Low Plan C Percent 0.00000.0000
Score Low Plan Full Percent 0.00000.0000
Score High Plan Period 12,403.77753,098.3920
Score High Unit upper 90% ciupper 90% ci
Score High Plan Full 0.00000.0000
Score High Plan Cumul 0.00000.0000
Score High Actual Period 12,403.77753,098.3920
Score High Actual Cumul 13,660.614210,482.1869
Score High Actual Period Change 0.00000.0000
Score High Actual Cumul Change 13,660.614210,482.1869
Score High Plan P Percent 100.0000100.0000
Score High Plan C Percent 0.00000.0000
Score High Plan Full Percent 0.00000.0000
Observations 1.01.0
Name NitrogenNitrogen
Label NN
Plan Period 22,516.98752,992.6520
Unit kg N / tonkg N / ton
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 22,516.98752,992.6520
Actual Cumul 24,798.422011,221.2169
Actual Period Change 0.00000.0000
Actual Cumul Change 24,798.422011,221.2169
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name PhosphorousPhosphorous
Label PP
Plan Period 2,647.9125215.3040
Unit kg P / tonkg P / ton
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 2,647.9125215.3040
Actual Cumul 2,884.4416864.2173
Actual Period Change 0.00000.0000
Actual Cumul Change 2,884.4416864.2173
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Operation AllAlt. 0Alt. 1
Name 2014 Conventional Orange Crop Operation2014 Organic Orange Crop Operation
Date 12/31/201412/31/2014 12:00:00 AM
Label A1001C2014A1001C2014
Indicators AllAlt. 0Alt. 1
Target actualactual
Date 12/31/201412/31/2014
Score Observations 1.01.0
Score Plan Period 1,732.68811,189.0000
Score Unit meanmean
Score Plan Full 0.00000.0000
Score Plan Cumul 0.00000.0000
Score Actual Period 1,732.68811,189.0000
Score Actual Cumul 3,401.25765,922.7730
Score Actual Period Change 0.00000.0000
Score Actual Cumul Change 3,401.25765,922.7730
Score Plan P Percent 100.0000100.0000
Score Plan C Percent 0.00000.0000
Score Plan Full Percent 0.00000.0000
Score Low Plan Period 1,729.82161,188.7950
Score Low Unit lower 90% cilower 90% ci
Score Low Plan Full 0.00000.0000
Score Low Plan Cumul 0.00000.0000
Score Low Actual Period 1,729.82161,188.7950
Score Low Actual Cumul 3,395.57365,916.9236
Score Low Actual Period Change 0.00000.0000
Score Low Actual Cumul Change 3,395.57365,916.9236
Score Low Plan P Percent 100.0000100.0000
Score Low Plan C Percent 0.00000.0000
Score Low Plan Full Percent 0.00000.0000
Score High Plan Period 1,735.55461,189.2050
Score High Unit upper 90% ciupper 90% ci
Score High Plan Full 0.00000.0000
Score High Plan Cumul 0.00000.0000
Score High Actual Period 1,735.55461,189.2050
Score High Actual Cumul 3,406.94165,928.6224
Score High Actual Period Change 0.00000.0000
Score High Actual Cumul Change 3,406.94165,928.6224
Score High Plan P Percent 100.0000100.0000
Score High Plan C Percent 0.00000.0000
Score High Plan Full Percent 0.00000.0000
Observations 1.01.0
Name Nitrate LossNitrate Loss
Label NO3NO3
Plan Period 1,578.91501,106.5326
Unit kg N03-N / hakg N03-N / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 1,578.91501,106.5326
Actual Cumul 3,132.49605,300.4559
Actual Period Change 0.00000.0000
Actual Cumul Change 3,132.49605,300.4559
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name Ammonia LossAmmonia Loss
Label NH3NH3
Plan Period 632.1978237.8082
Unit kg N03-N / hakg NH3-N / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 632.1978237.8082
Actual Cumul 1,311.08881,509.5172
Actual Period Change 0.00000.0000
Actual Cumul Change 1,311.08881,509.5172
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name Nitrous Oxide EmissionsNitrous Oxide Loss
Label N2ON2O
Plan Period 158.0553106.6000
Unit kg N2O-N / hakg N2O-N / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 158.0553106.6000
Actual Cumul 327.2088545.1535
Actual Period Change 0.00000.0000
Actual Cumul Change 327.2088545.1535
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name Global WarmingGlobal Warming
Label CO2ACO2A
Plan Period 8,195.46395,084.1476
Unit kg CO2 equivsCO2 eqivs / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 8,195.46395,084.1476
Actual Cumul 16,135.834426,140.8955
Actual Period Change 0.00000.0000
Actual Cumul Change 16,135.834426,140.8955
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name AcidificationAcidification
Label SO2ASO2A
Plan Period 105.3702229.6082
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 105.3702229.6082
Actual Cumul 216.9892916.6452
Actual Period Change 0.00000.0000
Actual Cumul Change 216.9892916.6452
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3ANO3A
Plan Period 199.0287434.6164
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 199.0287434.6164
Actual Cumul 413.05521,744.8789
Actual Period Change 0.00000.0000
Actual Cumul Change 413.05521,744.8789
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name EutrophicationEutrophication
Label NO3BNO3B
Plan Period 112.3902123.0000
Unit kg N03 equivsNO3 eqivs / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 112.3902123.0000
Actual Cumul 142.3592454.0277
Actual Period Change 0.00000.0000
Actual Cumul Change 142.3592454.0277
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Observations 1.01.0
Name AcidificationAcidification
Label SO2BSO2B
Plan Period 58.535182.0000
Unit kg SO2 equivsSO2 eqivs / ha
Plan Full 0.00000.0000
Plan Cumul 0.00000.0000
Actual Period 58.535182.0000
Actual Cumul 74.6696304.8345
Actual Period Change 0.00000.0000
Actual Cumul Change 74.6696304.8345
Plan P Percent 100.0000100.0000
Plan C Percent 0.00000.0000
Plan Full Percent 0.00000.0000
Dataset: LCA Organic vs Conventional Orange Crops IRI These operating budgets use life cycle analysis to compare conventional and organic orange production









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.